Carrier Access 1750 Manual De Usuario

Descargar
Página de 420
4-6
Broadmore 1750 - Release 4.6
Chassis Installation and Grounding
Rack Mounting Procedure
Rack Mounting Procedure
Rack-mounting the Broadmore 1750 chassis requires:
 
two technicians
 
clear access to front and rear of rack
 
user-provided rack mounting hardware (screws)
DANGER!   
E
XERCISE
 
NORMAL
 
PRECAUTIONS
 
FOR
 
LIFTING
 
HEAVY
 
OBJECTS
. U
SE
 
TWO
 
PEOPLE
 
TO
 
LIFT
 
THE
 B
ROADMORE
 1750. W
HEN
 
LIFTING
SUPPORT
 
IT
 
FROM
 
THE
 
BOTTOM
 
AND
 
TAKE
 
CARE
 
TO
 
AVOID
 
SHARP
 
EDGES
 
OR
 
CORNERS
WARNING!   
T
HE
 
FRONT
 
AND
 
REAR
 
COVERS
 
OF
 
THE
 
CHASSIS
 
MUST
 
REMAIN
 
ATTACHED
 
TO
 
PREVENT
 
THE
 
CHASSIS
 
FROM
 
BENDING
 
DURING
 
THE
 
RACK
-
MOUNTING
 
PROCEDURE
.
Perform the following steps:
1. Ensure that the front and rear chassis covers are firmly attached to provide 
mechanical support and prevent accidental damage.
2. Carefully lift the Broadmore 1750 and position it in the desired rack location. 
One technician should support the rear and the second should support the front. 
3. Ensure that there is a 1.75 inch space above the chassis for adequate air flow.
4. Insert screws through the chassis and rack mounting holes. Every bracket hole 
must have a screw securely installed to ensure proper weight distribution and 
support.