Xerox 721P85530 Manual De Usuario

Descargar
Página de 488
PRINT FORMAT COMMANDS
XEROX DOCUPRINT 180 LPS PDL REFERENCE
6-53
waste management data.  If a job consists of many reports, all 
those reports must be reviewed for waste management.
Use the Summary, Waste Management and Operation Detail 
options in the Audit Log Display (or Print) window to obtain a 
summary report with each waste management event and all 
logged operations.
Reconciliation, sequence error, and duplicate error auditing 
must be performed with job stream BTEXT.  For simplest 
operation, place all BTEXT into the job stream instead of 
splitting BTEXT between JSL and the job stream.  Select a 
report size that will facilitate auditing, for example, 5000 pages.  
Thus a job of 100,000 checks will be audited as twenty reports, 
and each audit report is available shortly after the last page of 
the report is printed
When displaying the list of audit logs, use the error filters in the 
Audit Log window to only list reports with reconciliation, 
sequence, or duplicate errors.  These can be specified singly or 
in combination with check boxes in the Audit Log window.
Even faster is to list audited jobs with these filters.  Then use 
the filters in the Audit Log Display (or Print) window to select 
which reports will print or display.  For summary or detail, only 
the reports with the selected errors will be processed.  Use the 
summary option and detail records with the selected errors will 
print or display.
The current limit for log lists is about 1200.  If this error occurs, 
try again with either a ’Jobs’ list or filters.  The current speed of 
log list display is about 18 seconds per 100 entries.  Hitting the 
’List’ target before the list is displayed causes the list to 
immediately clear and another list to generate.
Use operator options to stop the printer on reconciliation or 
sequence errors.  The Audit Log Administration window has a 
target labeled ’Defaults.’  Click on this to open the Audit Log 
Defaults window.  Check boxes stay in effect from session to 
session.
When the job stops due to a reconciliation error, the operator 
may display the audit log with an option in the window that is 
displayed.  This is not possible for sequence errors, however.
Jobs that consist of many small reports are not good candidates 
for waste management auditing as too many reports must be 
manually reviewed to see the waste management information.