Emulex NQGB-NT+ Manual De Usuario

Descargar
Página de 207
Printer Server Installation   2-45 
  
Display Lights (LEDs) 
1)  When the printer server is powered up, the green POWER LED will 
illuminate. 
2)  Wait 15 to 20 seconds after power is applied.   
During this period, the printer server is performing its self test. 
3)  If the network is active, the green NA LED will flash with network 
activity. 
4)  If any of the connected peripheral ports is active, the yellow PA LED will 
flash showing port activity. 
 
 
 
Figure 2-26:  Display LED’s 
 
Power 
LED 
PWR   PA   NA
   
CONFIGURATION           STP                              UTP
Printer 
Activity or PA 
LED
Network Activity 
or NA LED