GE 225 Manual De Usuario

Descargar
Página de 38
 
GE
 
OPM_SGS_ISG_M22_M30_0US_V011.doc 
23/38 Installation 
Guide 
SG Series 225 & 300 kVA 
3.8.2 Power 
connection 
with common input utility 
 
S
G
S
_
22
5-
30
0_
UPS
 con
ne
ct
ion 
common_GE_01US
N
L3
L2
L1
LO
AD
PE Load
PE
Input rectifier
1 -
 IN
PU
RE
CT
IF
IE
R
Position of the PE compression lugs in case
the cable input is from the bottom of the UPS
Input rectifier
PE
PE Load
N
L3-1
L2-1
L1-1
Fig. 3.8.2-1   Power connections Common Input Utility
 
 
 
Common Input Rectifier / Bypass 
L1-1 
Rectifier + Bypass Phase A 
 
 
L2-1 
Rectifier + Bypass Phase B 
 
 
L3-1 
Rectifier + Bypass Phase C 
 
 
Neutral (Bypass) 
PE 
Ground 
 
 
Output Load 
L1 
Load Phase A L2 
Load Phase B L3 
Load Phase C 
Neutral 
PE 
Ground 
 
 
Bus bars BR1BR2 and BR3 must remain connected. 
Cable terminations are to the Rectifier Input Lugs and Output Lugs as shown above. 
Connect wire to the Lugs using appropriate tools and appropriate torque. 
Torque specification for input/output and DC power connections on Bus BarsSection 3.8.1