 Installation 
Guide 
SG Series 225 & 300 kVA 
 
3.10  PARALLEL CONTROL BUS CONNECTION 
In cases of parallel operation, the communication between the units takes place through the 
control bus cables
 
Each parallel unit is equipped with an additional board “P13  RPA Board IM0006 where the 
connectors J52 (A) and J62 (B) are located. 
A short control cable provided with a ferrite ring core links the parallel board “P13 – RPA 
Board IM0048
 with the parallel bus socket on which must be connected the control bus 
cables JA
 and JB on PCB P34 – Bus Interface IM0048
All the parallel units are connected to the same control bus. 
 
This connection allows: 
• 
The microprocessors of each unit to communicate with each other. 
• 
The oscillators of each unit to be locked together. 
• 
The regulation loops to compare the output current of each unit in order to equally share 
the Load current. 
 
For increased reliability, this connection is made with redundant cables. 
In this way, communication is maintained between units in case one of the control cables 
should fail or be accidentally damaged or disconnected. 
 
The standard length of the control bus cable between two parallel unit is 40 ft 12 m
Maximal overall length of bus connection, between the first and the last unit, should not be 
longer than 276 ft / 84 m
Verify that control wiring is run in individual separate steel conduit. 
 
 
Under no circumstance should the control bus cable connecting JA 
(1/2/3/4/5/6/7)
 and JB (1/2/3/4/5/6/7)  be connected or disconnected after the 
system has been powered On.
 
 
S
G
T50
00_100-150
_RP
A
-I
M
004
8_0
1
JP3
JP1
JP4
IM 0048
JP2
JP1
JP2
JP4
JP3
JB1
JA1
JB1
JA1
JP2
JP1
JP3
JP4
JP3
JP2
JP1
JP4
IM 0048
JB2
JA2
JP1
JP2
JB2
JA2
JA3
JB3
JP4
JP3
JP3
JP2
JP1
JP4
IM 0048
JA1 + JB1
JA2 + JB2
JA3 + JB3
UPS 1
UPS 2
UPS 3
Next parallel
unit 4,5,6,7,8
 
Fig. 3.10-1   RPA System - Control bus connection
 
 
The shield of the control bus cable, connected on JA and JB  must be connected to 
ground with the appropriate cable clamps fitted on parallel bus socket. 
 
It is important to place the units in sequence of their assigned number. 
A unit number from 1 to 8, is defined by the setting of parameters and displayed on the panel. 
This number is also marked inside and outside the packaging.