2.1.3 Installation and Commissioning Checklist
•
Insulated Phillips and flathead screwdriver sets
•
Insulated wire & cable strippers/crimpers (for ground lug, DC cable, alarm, and GMT cable
installations)
installations)
•
8mm socket or wrench for ground cable installation
1
2.1.3 Installation and Commissioning Checklist
•
AC/DC system shelf mounted securely in rack
•
1 RU Distribution Shelf mounted securely in rack directly above the system shelf (if applicable)
•
AC and DC cabling meets local and national electrical code specifications
•
Installation in ETSI racks allows for front-to-back ventilation and the use of a ventilated door and
cabinet top
cabinet top
•
System alarm cabling is installed and secure
•
Power cables are secure and installed correctly
•
Rectifiers are installed and seated correctly in the system shelf
•
The controller and 1 RU Distribution faceplates are installed and secure (if applicable)
•
System shelf rear cover is installed and secured
•
System powers up and all red LEDs are extinguished after a few minutes
2.1.4 Installation Materials
and
list the Cisco supplied installation materials that ship with the Cisco AC/DC
Power System.
lists materials that will need to be furnished at the install location.
Table 2-1
Supplied Materials for the System Shelf
Description
Qty
Use
M6 0x20mm screw (thread forming)
6
Shelf mounting screws (ETSI racks/cabinets)
12-24 x1/2” screw (thread forming)
6
Shelf mounting screws (ANSI, IEC racks/
cabinets)
cabinets)
M6 cage nut
6
Shelf mounting nut (ETSI racks/cabinets)
Mounting bracket 600mm ETSI rack
2
Ear mounts (ETSI racks/cabinets)
2A GMT fuse
2
GMT fuse panel
5A GMT fuse
2
GMT fuse panel
10A GMT fuse
2
GMT fuse panel
15A GMT fuse
2
GMT fuse panel
Standard AC plug
4
AC plugs that meet local requirements
Cable ties
12
Securing cables
ESD wrist strap