AEG 10000 Manual De Usuario

Descargar
Página de 58
54 
bypass for the loads is done, i.e. activation of the manual 
bypass operation, suspension of the supply for the load by the 
UPS bus-bar. 
The clearance of the voltage of each UPS is realised in the 
low voltage distribution. Now the expansion resp. the 
reduction of the parallel compound can be executed now. 
Watch out for the bridge between “JP1” and JP2” and the 
parallel operation line. The activation follows the steps in 
chapter 9.3.1. 
i
 
For deactivating the UPS in the parallel 
compound just press the „OFF“ switch twice 
behind each other. Like this the UPS-Systems 
can be removed from the parallel operation 
bus-bar.