Cabletron Systems SEH-22 Manual De Usuario

Descargar
Página de 56
CHAPTER 4: CONNECTING TO THE NETWORK
4-10
SEH USER’S GUIDE
2. Attach one end of an AUI cable, no longer than 50 meters in length, to 
the port on the EPIM-X (Figure 4-6) and the other end to the intended 
node.
Figure 4-6. The EPIM-X
4.2
FINISHING THE INSTALLATION
The SEH is now ready for operation. Before placing the network into 
service, test the installation thoroughly, making sure that all stations can 
be addressed and that the SEH and all stations are indicating normal 
operation. Ensure that the networking software is configured properly to 
match the installed network. If errors or abnormal operation are 
encountered, proceed to Chapter 5, Troubleshooting.