Cisco Systems N7KF248XT25EP1 Manual De Usuario

Descargar
Página de 204
S e n d   d o c u m e n t   c o m m e n t s   t o   n e x u s 7 k - d o c f e e d b a c k @ c i s c o . c o m
E-2
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
OL-18634-01
Appendix E      Site Preparation and Maintenance Records
Contact and Site Information
Contact and Site Information
Use the following worksheet (
) to record contact and site information.
Power evaluation:
  •
Input power type
  •
Power receptacles
  •
Receptacle proximity to the equipment
  •
Dedicated (separate) circuits for power 
redundancy
  •
UPS for power failures
  •
Grounding: proper gauge wire and lugs
  •
Circuit breaker size
Grounding evaluation:
  •
Data center ground
Cable and interface equipment evaluation:
  •
Cable type
  •
Connector type
  •
Cable distance limitations
  •
Interface equipment (transceivers)
EMI evaluation:
  •
Distance limitations for signaling
  •
Site wiring
  •
RFI levels
Table E-1
Site Planning Checklist  (continued)
Planning Activity
Verification Time and Date
Table E-2
Contact and Site Information
Contact person
Contact phone
Contact e-mail
Building/site name
Data center location
Floor location
Address (line 1)
Address (line 2)
City
State