Cisco Systems N6KC600164P Manual De Usuario

Descargar
Página de 204
S e n d   d o c u m e n t   c o m m e n t s   t o   n e x u s 7 k - d o c f e e d b a c k @ c i s c o . c o m
2-11
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
OL-18634-01
Chapter 2      Installing a Cisco Nexus 7010 Chassis
Grounding the Cisco Nexus 7010 Chassis
Figure 2-4
Attaching the Cisco Nexus 7010 Chassis to the Rack
Grounding the Cisco Nexus 7010 Chassis
The Cisco Nexus 7010 system is grounded through the AC power supply cables and one of two 
grounding connections on the chassis. The AC power supply cables provide a connection to an earth 
ground whenever you connect the AC power to the system. The system ground, also referred to as the 
network equipment building system (NEBS) ground, provides additional grounding for EMI shielding 
requirements and for the low-voltage supplies (DC-DC converters) on the modules. This grounding 
system is active even when the AC power cables are not connected to the system. You establish this 
ground by connecting one of the two grounding pads on the chassis to the rack (if it is connected to an 
earth ground) or directly to the earth ground for the data center building. 
This section includes the following topics:
  •
  •
  •
  •
187185
2
2
2
2
1
1
1
Handles used to adjust the chassis placement. 2
Four M6 x 19 mm or 10-24 x 3/4 in. Phillips 
screws used to attach each side bracket to a 
front mounting rail (use a total of eight 
screws)