Chapter 2      Site Planning
Site-Planning Checklist
Step 9
Prepare the other end of the grounding wire and connect it to an appropriate 
grounding point at your site to ensure adequate earth ground for the switch.
Site-Planning Checklist
 lists the site-planning activities that you should complete before you 
install the Catalyst 2948G, 2948G-GE-TX, and 2980G switches. Completing 
each activity helps ensure a successful switch installation.
Table 2-2
Site-Planning Checklist
Task No.
Planning Activity 
Verified By
Time
Date
1
Space evaluation:
Space and layout
Floor covering
Impact and vibration
Lighting
Maintenance access
2
Environmental evaluation:
Ambient temperature
Humidity
Altitude
Atmospheric contamination
Airflow
3
Power evaluation:
Input power type
Proximity of receptacle to the equipment
Dedicated (separate) circuits for redundant power supplies
UPS for power failures
4
Grounding evaluation:
Circuit breaker size