Chapter 2      Switch Installation
Powering the Switch and Connecting Devices
Step 6
Using a ratcheting torque screwdriver, torque each ground-lug screw to 15 lbf-in. (240 ozf-in.)
Figure 2-18 Torquing Ground-Lug Screws on the Switch
Powering the Switch and Connecting Devices
These sections describe powering the switch, connecting an RPS, connecting cables, and 
inserting GBICs.
Powering the Switch
Use the supplied AC power cord to connect the AC power socket on the switch rear panel to an AC power 
outlet.
When the switch powers on, it automatically begins the power-on self-test (POST), a series of tests that 
verifies that the switch functions properly. When POST completes, the system LED is green. If the 
switch fails POST, the system LED is amber, and the port LED associated with the particular test is 
amber.
If POST fails, see 
 to determine a course of action.
Torque to 15 lbf-in.
93286