Cisco Systems ME 2400 Manual De Usuario

Descargar
Página de 88
 
2-7
Cisco ME 2400 Ethernet Access Switch Hardware Installation Guide
OL-7678-01
Chapter 2      Switch Installation
Verifying Switch Operation
Verifying Switch Operation
Before installing the switch in a rack, on a wall, or on a table or shelf, you should power the switch and 
verify that the switch passes POST. 
To power on the switch, connect one end of the AC power cord to the AC power connector on the switch, 
and connect the other end of the power cord to an AC power outlet.
To power on a DC switch, see 
When the switch powers on, it automatically begins the POST, a series of tests that verifies that the 
switch functions properly. When the switch begins POST, the system LED slowly blinks green. When 
POST completes, the system LED blinks amber. If POST fails, the system LED remains amber. If POST 
completes successfully, the system LED rapidly blinks green.
Note
POST failures are usually fatal. Call Cisco Systems if your switch does not pass POST.
Powering Off the Switch
After a successful POST, disconnect the power cord from the switch. Install the switch in a rack, on a 
wall, on a table, or on a shelf as described in the 
Installing the Switch
This section describes these installation procedures:
Rack-Mounting 
To install the switch in a 19-inch, 23-inch, 24-inch rack, or a European Telecommunications Standards 
Institute (ETSI) rack (24-inch racks and ETSI racks require optional mounting hardware), follow the 
instructions described in these procedures: