Cisco Systems Catalyst 2955 Manual De Usuario
3-25
Catalyst 2955 Hardware Installation Guide
78-14944-03
Chapter 3 Installation
Verifying Switch Operation
Figure 3-11
Clasping the Ferrite
Attach the Power and Relay Connector to the Switch
Follow these steps to attach the power and relay connector to the front panel of
the switch.
the switch.
Step 1
Insert the power and relay connector into the power and relay connector
receptacle on the switch front panel (see
receptacle on the switch front panel (see
Caution
Secure the wires coming from the power and relay connector so that they cannot
be disturbed by casual contact. For example, use tie wraps to secure the wires to
the rack.
be disturbed by casual contact. For example, use tie wraps to secure the wires to
the rack.
104351
RT A1
A2
VB
VA
A1
A2
RT