Cisco Systems Catalyst 2955 Manual De Usuario

Descargar
Página de 298
 
3-25
Catalyst 2955 Hardware Installation Guide
78-14944-03
Chapter 3      Installation
Verifying Switch Operation
Figure 3-11
Clasping the Ferrite
Attach the Power and Relay Connector to the Switch
Follow these steps to attach the power and relay connector to the front panel of 
the switch.
Step 1
Insert the power and relay connector into the power and relay connector 
receptacle on the switch front panel (see 
Caution
Secure the wires coming from the power and relay connector so that they cannot 
be disturbed by casual contact. For example, use tie wraps to secure the wires to 
the rack.
104351
RT A1
A2
VB
VA
A1
A2
RT