Cisco Systems SFS 7012 Manual De Usuario

Descargar
Página de 116
  27
Cisco SFS 7012 InfiniBand Server Switch Hardware Users Guide 
OL-8787-04
Chapter 
Figure 2-9
SFS 7012 Chassis — Spine Module Slot Numbering
b.
Leaf Modules— Leaf modules should be populated beginning with slot 1, then slot 2, then slots 3 
through 12 respectively. Refer to 
:
Figure 2-10 SFS 7012 Chassis — Leaf Module Slot Numbering
Step 2
To install a module or filler, hold it so that the ejector handles are on the bottom.
Step 3
Pull the handles out to extend them. Slide the module into the appropriate slot of the chassis until it 
makes contact with the backplane. As the module seats in the chassis, the handles will begin to close.
Step 4
Push the handles in to fully close.
Note
Be sure that all cards are fully inserted in their respective chassis slots, and that the handles are in the 
locked position. This prevents accidental removal, provides proper grounding for the system, and helps 
to seat the bus connectors in the backplane receptacles.
Connect Equipment to the Ports and Power On the System
Note
Before performing the tasks in this section, take a few minutes to review 
 and 
 
below. It is important to understand the slot numbering for the leaf modules and spine modules (and the 
corresponding spine RJ-45 ports). It is also important to understand the slot numbering for the fans and 
power supplies (and the corresponding AC power inlets for the power supplies).
Leaf 1
Leaf 2
Leaf 4
Leaf 6
Leaf 8
Leaf 10
Leaf 12
Leaf 3
Leaf 5
Leaf 7
Leaf 9
Leaf 11