3com 3CRWXR10095A Manual De Usuario

Descargar
Página de 516
Generating RF Network Design Information
155
Generating RF 
Network Design 
Information
After 3WXM has calculated the number of MAPs required to provide 
wireless coverage, you can generate a work order report. The work order 
report provides all of the necessary information for the physical 
installation of the 3Com Mobility System. A work order shows where the 
MAPs should be installed, WX initial setup configuration information, and 
projected RSSI information that is useful when verifying the installation.
After deployment, you can generate a work order with the optional RSSI 
projection tables and MAP MAC addresses, and use it for 
post-deployment verification.
To generate a work order report
Display the floor plan in the Content panel.
In the Task List panel, click RF Planning.
Under RF Planning, click Work Order Report. The Work Order Generation 
dialog is displayed.