McDATA IPS4300 Manual De Usuario

Descargar
Página de 188
4-2
McDATA Sphereon 4300 Fabric Switch Installation and Service Manual
Repair Information
Power On Switch
To power on the switch:
1. An alternating current (AC) power cord is required for the power 
supply. Ensure the correct power cord is available.
DANGER
Use the supplied power cords. Ensure the facility power 
receptacle is the correct type, supplies the required voltage, and is 
properly grounded.
2. Plug the power cord into a facility power source and the AC 
connector at the rear of the switch. When the power cord is 
connected, the switch powers on and performs power-on 
self-tests (POSTs).
3. During POSTs:
— The green PWR LED on the switch front panel illuminates.
— The  amber  ERR LED on the switch front panel blinks 
momentarily while the switch is tested.
— The green LED associated with the Ethernet port blinks 
momentarily while the port is tested.
— The blue/green and amber LEDs associated with Fibre 
Channel ports blink momentarily while the ports are tested.
4. After successful POST completion, the PWR LED remains 
illuminated and all amber LEDs extinguish.
5. If a POST error occurs, go to 
 to isolate the 
problem.