Intel SE7501CW2 Manual De Usuario

Descargar
Página de 25
Intel Server Board SE7501CW2
 
Installation and Integration Guide 
Installing the Chassis Feet (Pedestal Mode) 
1.  If you are installing this server into a rack system, skip 
these steps and go to “Installing into a Rack (Rack 
kbench. 
assis. The 
th only one set of holes in 
oot, the middle hole should 
face toward the front of the chassis. Hole locations for 
the front foot are marked “F” and “1, 2”. On the back 
foot, the middle hole should face toward the back of 
the chassis. Location holes for the rear foot are 
marked “F”. 
Installing into a Rack (Rack Mode)
 
The Intel Server Chassis SC5200 is designed to be 
 sure to 
rack cabinet enclosure that is EIA-310-d 
mpliant. For additional compatibility and rack cabinet 
lection information, see:  
http://support.intel.com/support/motherboards/server/ch
2.  Move the chassis to the edge of your wor
3.  Use four screws to attach each foot to the ch
holes in the feet line up wi
the chassis. On the front f
 
compatible with the EIA-310-d rack standard. Be
select a 
co
se
assis/sc5200
 
 
.  Fully extend the rails. 
 
4. 
 
ack may vary from the illustration. Refer to your 
rack documentation for information specific to your rack.  
 
Hold the chassis so the rails on the chassis engage the rails in 
your rack. You will need someone to help you at this point. 
Disengage the locking tab on each rail and slide the server into 
the rack. 
 
 
 
1
2.  Remove the smallest and innermost rail.
3.  Position the rail. 
Insert and tighten four screws. 
5.  Install the rest of the rail in your rack.
Note:  
Your r
20