Schneider Electric SR2MAN01 Manual De Usuario

Descargar
Página de 177
Implementing a Basic Application
160
SR2MAN01 11/2007
Entering the Coil 
and Joining it to 
the Contacts
To enter the coil in the first line and connect it to the coils, proceed as follows:
Step Action
Screen
Comment
1
...
then
The cursor flashes in succession:
z
At a link point:  ,
z
At a contact point:  .
Until positioned at the end of the 
line ready to enter the coil.
2
The 
[ flashes.
3
The 
M flashes.
4
The 
Q flashes.
5
The cursor   is displayed.
6
Pressing and holding down the 
Shift 
key (white) will make a contextual 
menu appear that is used for 
programming the connections.
7
   
3 times
The link is created.
11 fois
 I1-i2 
 I1-i2 
 I1-i2
+
+
 I1-i2          [M1
 I1-i2          [M1
+
+
 I1-i2          [Q1
2 fois
 I1-i2          [Q1
+
 I1-i2----------[Q1