Bunn FPG-2 Manual De Usuario

Descargar
Página de 79
42
SERVICE (Cont.)
Location:
The relay is located either on the timer bracket or on 
the component mounting bracket in the grinder base. 
The bracket can be removed by loosening the two 8-32 
screws beneath the timer dial.
Test Procedure:
1.  Disconnect the grinder from the power supply.
2.  Access the relay and remove the wires from all 
terminals.
3.  With an ohmmeter, check for continuity between 
the 0 and 1 terminals.
4.  With an ohmmeter, check that there is an open 
circuit between terminals 2 and 4, and between 
terminals 6 and 8.
If continuity is present as described, reconnect the 
wires, the relay is operating properly.
If continuity is not present as described, replace the 
relay.
Relay (Models MHG, FPG-2 DBC, Late Model G-9, G9-2, G9-2 DBC)
FIG 42 RELAY
FIG 43 RELAY TERMINALS
Removal and Replacement
1.  Disconnect the grinder from the power supply.
2.  Remove all wires from the relay terminals.
3.  Remove the two 8-32 screws attaching the relay to 
the mounting bracket.
4.  Refer to Fig 43 when connecting relay wires.
41545 122209