Henkel 97504 Manual De Usuario
![Henkel](https://files.manualsbrain.com/attachments/c2e09dd8b25704d54e4c317b576b4f0b4bed83fd/common/fit/150/50/86a288967b4b5d388f6dd7194f54440d3416f8f57a5da7d5d244563e3f4c/brand_logo.jpeg)
76
3 Operation
3.9 Shutdown
• Switch the dispensing station off.
• Disconnect from power and compressed air supply.
• Disconnect tubing set.
• Unscrew pressure lines from meter-mix dispense gun.
• Clean meter-mix dispense gun – see Section 5.6.
• Disassemble the pump, remove stator – see Section 5.3.
• Clean pump – see Section 5.2.
• Store dispensing station as specified in Section 8.3.
• Disconnect from power and compressed air supply.
• Disconnect tubing set.
• Unscrew pressure lines from meter-mix dispense gun.
• Clean meter-mix dispense gun – see Section 5.6.
• Disassemble the pump, remove stator – see Section 5.3.
• Clean pump – see Section 5.2.
• Store dispensing station as specified in Section 8.3.
3.10
Return to Operation
• Qualified service staff is required to check and confirm that the dispensing station
is in a safe operating condition – see Section 2.4.2.
• Make sure that the pumps are free of product residues.
• Assemble cleaned or new tubing set.
• Assemble cleaned meter-mix dispense gun.
• Connect to power and compressed air supply.
• Follow instructions in Section 3.3.4 to prime and calibrate the dispensing station.
• Assemble cleaned or new tubing set.
• Assemble cleaned meter-mix dispense gun.
• Connect to power and compressed air supply.
• Follow instructions in Section 3.3.4 to prime and calibrate the dispensing station.