Bunn NHBX-B Manual De Usuario

Descargar
Página de 16
4
Initial Set Up Guide
1.  Slide empty funnel into funnel guides 
as shown.
2.  Fill decanter with cold water. Swivel 
brewer lid and pour water into brewer. 
Position decanter on base below 
funnel. Close the lid and wait 
three 
minutes while the internal tank 
partially fills.
3.  Open the lid. Remove decanter and 
fill with cold water 
again. Pour water 
into brewer. Position decanter on base 
under funnel and close the lid.
4.  Wait until water flows from the funnel. 
When water flow stops, pour out 
any water that has collected in the 
decanter. Replace decanter on brewer 
below the funnel.
5.  Now, plug in the brewer.
6.  Press the vacation switch, located 
on the side 
(NHBX) or the back 
(STX) of the brewer, to turn unit 
on (Press 
I to turn on and press O 
to turn off.) Wait 15 minutes for the 
water in the tank to heat. 
See steps on page 5 for brewing perfect coffee. 
NHBX
STX
IMPORTANT:
Brewer is NOT ready to plug in until you have followed  
the steps below.  Do NOT plug in brewer until step #5.