Bunn U3 Manual De Usuario

Descargar
Página de 42
Page 18
SERVICE (cont.)
FUSE AND FUSE HOLDER (208V, 240V, 230V Two 
Wire Models and 380V Three Wire Models)
Location:
 
The fuse and fuse holder are located on the right 
rear of the component bracket.
Test Procedures:
1.  Disconnect the brewer from the power source.
2.  Remove the cap and fuse from the fuse holder.
3.  Remove fuse from the cap.
4.  Check for continuity through the fuse.
If continuity is present as described, reinstall the fuse, 
the fuse is operating properly.
If continuity is not present as described replace the 
fuse.
FIG.8 FUSE AND FUSE HILDER
P1731.55
Removal and Replacement:
Fuse:
1.  Remove the cap from the fuse holder.
2.  Remove fuse from the fuse holder, inspect, if blown 
discard.
3.  Install new 5 amp fuse in the fuse holder.
4.  Reinstall fuse holder cap.
Fuse Holder:
1.  Disconnect  the  wires  from  the  rear  of  the  fuse 
holder.
2.  Remove the nut securing the fuse holder to the 
component bracket.
3.  Push fuse holder through the hole in the component 
bracket.
4.  Install new fuse holder and fuse through the hole 
in the component bracket and secure with nut.
5.  Refer to Fig. 9 and reconnect the wires.
BLK  from ON/OFF  Switch 
(208V,  240V  Two  Wire 
Models  and  380V  Three 
Wire Models)
RED  from  ON/OFF  Switch 
(230V Two Wire Models)
FIG. 9 FUSE HOLDER  TERMINALS
P1331
BLK from Main Harness 
(208V and 240V Two Wire 
Models)
BLK from Transformer
(380V Three Wire Models)
RED from Main Harness
(230V Two Wire Models)
10060  031599