Bunn JDF-4SB Manual De Usuario

Descargar
Página de 57
25
SERVICE (CONT.)
Control Board, Main (all Models)
FIG. 23 CONTROL BOARD
P3250.25
Location:
 
The Main Control Board is located on the electrical 
component enclosure behind the splash panel.
Test Procedure:
Power Supply Circuitry:
1.  Disconnect the dispenser from the power source.
2.  With a voltmeter, back probe check the voltage 
across pins 1 & 3 of  the J6 connector on the wir-
ing harness. Connect the dispenser to the power 
source. The indication must be 24 volts ac.
3.  Disconnect the dispenser from the power source.
If voltage is present as described, proceed to step 4.
If voltage is not present as described, refer to the Wiring 
Diagrams and check the dispenser wiring harness back 
to the transformer (See TRANSFORMER).
4.  Disconnect the dispenser from the power source.
5.  With a voltmeter, back probe check the voltage 
across pins 1 & 3 of  the J12 connector on the 
wiring harness. Connect the dispenser to the power 
source. The indication must be 24 volts ac.
6.  Disconnect the dispenser from the power source.
If voltage is not present as described, refer to the Wiring 
Diagrams and check the dispenser wiring harness back 
to the transformer (See TRANSFORMER).
Removal and Replacement:
1.  Remove the four #6-32 screws securing the control 
board to the component bracket.
2.  Disconnect all the plugs on the main wiring harness 
from the connectors on the control board.
3.  Remove the spacers from the control board and 
discard.
4.  Install the spacers on to the new control board
5.  Reconnect all plugs on the main harness to the 
connectors on the control board.
6.   Install new control board on the component bracket 
using four #6-32 screws.
NOTE: Verify all ground wires are connected to the 
grounding stud and secured with nuts.
FIG. 24 CONTROL BOARD CONNECTORS
JDF-4S shown
JDF-2S
JDF-4S
49179  110613