Bunn AFPO-3 SL Manual De Usuario

Descargar
Página de 25
6
FLA
VOR
INPUT
1  
 
2
WA
TE
R
INP
UT
REFILL
MA
IN
PO
WE
R
2
1
1
2
3
3
3
FL
AV
OR
OU
TP
UT
FL
AV
OR
OU
TP
UT
WA
TE
R
OU
TP
UT
FL
AV
OR
OU
TP
UT
WA
TE
R
OU
TP
UT
WA
TE
R
OU
TP
UT
OPERATING CONTROLS
A. MAIN POWER ON/OFF
The main power ON/OFF switch is located on the right of the front panel just above the power cord.
B. REFILL CIRCUIT ON/OFF
The refill circuit ON/OFF switches are located on the right of the front panel just above the main power switch. 
These allow each circuit to operate independently.
P1949
C. TEST/OPERATE
The TEST/OPERATE switch is located inside the auto-fill 
box just below the top access cover. For setting flow 
rates and mix ratios for flavors, place the TEST/OPER-
ATE switch in the “TEST” position. This allows the op-
erator to run the water and flavor lines for each circuit 
depending on the requirements for the flavor recipe.
D. PROBE CONTROL BOX LOW/OFF/HIGH
On models equipped with a dual level probe, there is a 
LOW/OFF/HIGH switch located at the probe control box 
on the hopper. The “OFF” position allows the operator 
to disable the probe for that hopper only. THE “LOW” 
and “HIGH” positions allow the operator to select the 
level of product desired for that hopper.
P1951
C
B
A
D
41093 040408