chilled water flowing. If the entering CHILLED WATER/BRINE TEMPERATURE increases 
above the ICE BUILD SETPOINT plus the RECYCLE DELTA T value, the compressor will 
restart and control the CHILLED WATER/BRINE TEMPERATURE to the ICE BUILD 
SETPOINT.
Temperature Control During Ice Build
During ice build, the capacity control algorithm uses the WATER/BRINE CONTROL POINT 
minus 5 F (2.7 C) to control the LEAVING CHILLED WATER temperature. The ECW OPTION 
and any temperature reset option are ignored during ice build. The 20 mA DEMAND LIMIT 
OPTION is also ignored during ice build.
Termination of Ice Build 
Ice build termination occurs under the following conditions:
1. Ice Build Time Schedule — When the Ice Build Time Schedule transitions to 
UNOCCUPIED, ice build operation shall terminate. 
2. ECW TEMPERATURE — Termination of compressor operation, based on temperature, 
shall occur if the ICE BUILD TERMINATION is set to the ICE BUILD TERMINATION TEMP 
option and the ENTERING CHILLED WATER temperature is less than the ICE BUILD 
SETPOINT. If the ICE BUILD RECYCLE OPTION is set to ENABLE, a recycle shutdown 
occurs and recycle start-up shall be based on LEAVING CHILLED WATER temperature 
being greater than the WATER/BRINE CONTROL POINT plus RECYCLE DELTA T.