Carrier 17/19EX Manual De Usuario

Descargar
Página de 437
INITIAL START-UP CHECKLIST FOR
17/19EX CENTRIFUGAL LIQUID CHILLER
(Remove and use for job file.)
MACHINE INFORMATION:
NAME
JOB NO.
ADDRESS
MODEL
CITY
STATE
ZIP
S/N
DESIGN CONDITIONS:
TONS
BRINE
FLOW
RATE
TEMPERATURE
IN
TEMPERATURE
OUT
PRESSURE
DROP
PASS
SUCTION
TEMPERATURE
CONDENSER
TEMPERATURE
COOLER
******
CONDENSER
******
COMPRESSOR:
Volts
RLA
OLTA
STARTER:
Mfg
Type
OIL PUMP:
Volts
RLA
OLTA
REFRIGERANT:
Charge
Lbs
CARRIER OBLIGATIONS:
Assemble . . . . . . . . . . . . . . . Yes
M
No
M
Leak Test . . . . . . . . . . . . . . . Yes
M
No
M
Dehydrate . . . . . . . . . . . . . . . Yes
M
No
M
Charging . . . . . . . . . . . . . . . . Yes
M
No
M
Alignment . . . . . . . . . . . . . . . Yes
M
No
M
Operating Instructions
Hrs.
START-UP TO BE PERFORMED IN ACCORDANCE WITH APPROPRIATE MACHINE START-UP
INSTRUCTIONS
JOB DATA REQUIRED:
1. Machine Installation Instructions . . . . . . . . . . . . . . . . . . . . . . . . . Yes
M
No
M
2. Machine Assembly, Wiring and Piping Diagrams . . . . . . . . . . . . Yes
M
No
M
3. Starting Equipment Details and Wiring Diagrams . . . . . . . . . . . . Yes
M
No
M
4. Applicable Design Data (see above) . . . . . . . . . . . . . . . . . . . . . . Yes
M
No
M
5. Diagrams and Instructions for Special Controls . . . . . . . . . . . . . Yes
M
No
M
INITIAL MACHINE PRESSURE:
YES
NO
Was Machine Tight?
If Not, Were Leaks Corrected?
Was Machine Dehydrated After Repairs?
CHECK COMPRESSOR OIL LEVEL AND RECORD:
ADD OIL:
Yes
M
No
M
Amount:
RECORD PRESSURE DROPS:
Cooler
Condenser
CHARGE REFRIGERANT:
Initial Charge
Final Charge After Trim
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 2
2
Tab
5a 5d
PC 211
Catalog No. 531-715
Printed in U.S.A.
Form 17/19EX-1SS
Pg CL-1
9-95
Replaces: 19EX-1SS