Bradford-White Corp Copper Brute II Hydronic Boiler Manual De Usuario

Descargar
Página de 64
Page 4
 
B
RADFORD
 W
HITE
 C
ORP.
SECTION 1.
General Information
USING THIS MANUAL – Because the 
Copper Brute II Boilers and Copper Brute II Water 
Heaters are identical appliances, with the exception 
of materials of manufacture, labels and ultimate 
use application, this manual provides information 
for the proper installation, operation and 
maintenance of both products. Where differences 
exist between the application of the appliances and 
their operation, the sections pertinent to only one 
appliance or the other will be so identified.
In the Commonwealth of Massachusetts, this 
appliance must be installed by a licensed plumber or 
gas fitter.
 WARNING
The Copper Brute II hydronic, boiler or water 
heater must
 be installed in accordance with the 
procedures detailed in this manual, or the Bradford 
White warranty may be voided. The installation must 
conform to the requirements of the local jurisdiction 
having authority, and, in the United States, to the 
latest edition of the National Fuel Gas Code, ANSI 
Z223.1/NFPA54. In Canada, the installation must 
conform to the latest edition of the Natural Gas 
and Propane Installation Code, CSA B149.1 and/
or local codes. Where required by the authority 
having jurisdiction, the installation of Copper Brute 
II appliances must conform to the Standard for 
Controls and Safety Devices for Automatically Fired 
Boilers, ANSI/ASME CSD-1. Any modifications to 
the boiler, its gas controls, or wiring may void the 
warranty. If field conditions require modifications, 
consult the factory representative before initiating 
such modifications.
1.1 Introduction
This manual provides information necessary 
for the installation, operation, and maintenance of 
Bradford White Corp, Copper Brute II copper tube 
appliances. Read it carefully before installation.
All application and installation procedures 
should be reviewed completely before proceeding 
with the installation. Consult the Bradford White 
factory, or local factory representative, with any issues 
or questions regarding this equipment. Experience 
has shown that most operating issues are caused by 
improper installation.
The Copper Brute II appliance is protected 
against over pressurization. A pressure relief valve 
is fitted to all appliances. It is installed on the outlet 
header, at the water outlet of the appliance.
IMPORTANT: The inlet gas pressure to the appliance 
must not exceed 13" w.c. (3.2kPa).
All installations must be made in accordance with:
1) In the U.S., the " National Fuel Gas 
Code"ANSI Z223.1/NFPA54, Latest Edition and all 
applicable local codes as required by the Authorities 
Having Jurisdiction (AHJ), or
2) In Canada, the "Natural Gas and Propane
Installation Code", CSA B149.1, latest edition and all 
applicable local codes as required by the AHJ.
All electrical wiring is to be done in accordance with:
1). In the U.S., the "National Electrical Code" 
(NEC), ANSI/NFPA 70, latest Edition and all 
applicable local codes as required by the AHJ, or
2). In Canada, the “Canadian Electrical Code 
- Part 1”, CSA STD. C22.1 and all applicable local 
codes as required by the AHJ.
This appliance must be electrically grounded in
accordance with the applicable codes and standards
referenced above.
1.2  Model Identification
Consult the rating plate on the unit. The 
following information describes the model number 
structure.
 
6  7  8 
10 
11 
12 
13 
14 
15 
16
 
B  W  C 
 
 
 
 
 
 
 
2
SERIES
 B  W  C
USAGE
H
V
SIZE
 
0  5 0 0
 
0  7 5 0
 
1  0 0 0
 
1  2 5 0
 
1  5 0 0
 
1  7 5 0
 
2  0 0 0
FUEL
N
P
ALTITUDE
A
FIRING 
MODE
K
 (500/750)
N
 (1000)
L
 (1250-2000)
LOCATION
C
REVISION
2
HEAT 
EXCHANGER
B
C
K
N
P
S
OPTIONS
CODE
X
J
L
PUMP
OPTIONS
X
H
N
S