Installation 
Utility Connections
  
27" [686]
2½" [64]
8¾"
[222]
1
2
3
Plan View
6¼" [156]
6¼" [156]
7¼" [181]
25" [635]
6 ft. 
(1.5M)
Front View
39" [991]
5½" [140]
4¾" [121]
1
2
3
Side View
13½" [343]
8¾" [222]
17¾" [451]
3
2
1
39" [991]
7¼" [184]
4
All utility connections must be performed 
by qualified people that will follow electric, 
plumbing, and sanitary codes and regulations.
Contact the Manufacturer's National Service Dept. for assistance.
ATTENTION
Champion Industries 
1-800 858-4477
 
 
4
3
2
1
Hot Water Connection:
140-160°F/60-71°C
½" IPS 
Flow pressure 25-95 PSI [173-655 kPa].
Install water shut-off valves and check-valves
in the water inlet supply lines and
as close to the machine as possible 
    
Cold Water Connection:
75°F/24°C
½" IPS 
Flow pressure 25-95 PSI [173-655 kPa].
Install water shut-off valves and check-valves
in the water inlet supply lines and
as close to the machine as possible 
      
Drain Connection:
Gravity
1½" Tailpiece (slip-fit) 
Maximum drain flow 3 US gallons/min [11L/min]
Electric Connection:
208-230VAC/50-60HZ/1PH
Min/Max 15A
6 ft. /1.5 m flexible cord and plug supplied
NEMA 6-15P electric outlet