Grindmaster PIC-2 Guía Del Usuario

Descargar
Página de 16
Weekly Cleaning (cont.)
Cleaning Hoppers – Disassembly
Cleaning Hoppers – Reassembly
CAUTION: Do not wash hopper without first 
disassembling.
IMPORTANT: All components must be completely dry
prior to reassembly.
PIC 1, 2, 3, 4, 5, 6: Open door and
rotate elbow on hopper to the UP
position to prevent spillage. 
PIC 1, 2, 3, 4, 5, 6: Place driveshaft 
bearing inside hopper with threads 
going through hole in the rear of the  
hopper.
PIC 1, 2, 3, 4, 5, 6: Remove the hopper from
the cabinet.
PIC 1, 2, 3, 4, 5, 6: Secure the bearing by 
attaching the palnut to the bearing outside 
rear hopper opening. Use one hand inside the 
hopper to push the bearing outward while turning the 
palnut clockwise.
PIC 1, 2, 3, 4, 5, 6:
Remove the hopper cover 
and empty hopper 
contents.
PIC 1, 2, 3, 5, 6: Install the auger spring
driveshaft and the auger spring by 
inserting the flat end of the spring into 
the hole in the auger spring driveshaft.
PIC 1, 2, 3, 5, 6: Pull off
the elbow.
PIC 4: Pull off elbow    
and hopper base.
PIC 1, 2, 3, 4, 5, 6: Insert assembly into lower
front hopper opening, making sure the threaded
end of the auger spring driveshaft completely inserts
into the plastic driveshaft bearing in the rear of the
hopper. The driveshaft bearing threads should be
accessible from the outside rear of the hopper.
PIC 1, 2, 3, 5, 6: Remove the auger pinwheel by pulling it 
forward while stretching out the sides of the hopper. 
PIC 4:
Thin hopper: Remove the auger pinwheel by pulling it
forward while stretching out the sides of the hopper.
Wide hopper: Remove wing nut and flat washer on
outside of hopper and remove pinwheel assembly
(gear w/ spring and pinwheel w/ 2 springs).
PIC 1, 2, 3, 4, 5, 6: Place the 
washer over the driveshaft bearing
threads followed by securing the 
drivelink onto the driveshaft bearing by
turning counterclockwise. Secure the
auger spring with one hand while
attaching the drivelink with the other.
PIC 1, 2, 3, 4, 5, 6: Remove the drivelink and washer at the
rear of the hopper by holding the auger spring with one
hand at the front of the hopper while
turning the drivelink clockwise with the
other hand.
PIC 1, 2, 3, 5, 6: Replace the auger pinwheel making sure
the pins are securely positioned inside the locator holes in 
the hopper.
PIC 4:
Thin hopper: Replace the auger pinwheel making
sure the pins are securely positioned inside the
locator holes in the hopper.
Wide hopper: Replace pinwheel assembly by 
inserting gear through the pinwheel and inserting
threads through the hopper wall. 
For either hopper: Turn coupling and make sure 
pinwheel is properly installed and turns freely.
PIC 1, 2, 3, 5, 6: Remove the auger spring and
auger spring driveshaft
by pulling out through the
lower front opening of the hopper.
PIC 4: Remove the auger with o-ring
by pulling them out through the lower front 
opening of the hopper.
Replace the elbow in the UP
position.
PIC 1, 2, 3, 5, 6: Remove the palnut at the rear of the 
hopper by turning it counterclockwise then remove the 
driveshaft bearing from the inside of the hopper.
PIC 4: Remove the nuts at the front and rear of
the hopper by turning 
counterclockwise, then remove
the bearings from the inside of
the hopper.
Fill the hopper with
product and 
replace 
the cover.
Reinstall hopper into the machine, making
sure it is properly positioned inside the 
notches under the hopper.
PIC 1, 2, 3, 4, 5, 6: All parts in contact with food must be
washed, rinsed, sanitized, and air dried.
Turn the elbow down toward the mixing 
funnel, making sure it is lined up over the 
funnel opening.
1.
2.
3.
4.
5.
1.
2.
3.
4.
6.
9.
8.
7.
5.
6.
7.
8.
9.
10.
PULL
Elbow
Base 
(PIC4 only)
Driveshaft 
Bearing
Auger Spring
Driveshaft
PULL
Crathco
®
Powdered Beverage Dispensers
Page 3
English