3com 5500-ei pwr Instruccion De Instalación

Descargar
Página de 1072
 
1-49 
VLAN-VPN Tunnel Configuration Example 
Network requirements 
z
 
Switch C and Switch D are the access devices for the service provider network.  
z
 
The 3Com switches 5500-EI operate as the access devices of the customer networks, that is, 
Switch A and Switch B in the network diagram. 
z
 
Switch C and Switch D are connected to each other through the configured trunk ports of the 
switches. The VLAN-VPN tunnel function is enabled in system view, thus implementing 
transparent transmission between the customer networks and the service provider network.  
Network diagram 
Figure 1-11 
Network diagram for VLAN-VPN tunnel configuration 
Eth 1/0/1
Switch A
Switch D
Switch C
Switch B
Eth 1/0/1
GE 1/0/2
GE 1/0/1
GE 1/0/2
GE 1/0/1
 
 
Configuration procedure 
1)  Configure Switch A 
# Enable MSTP. 
<Sysname> system-view  
[Sysname] stp enable 
# Add Ethernet 1/0/1 to VLAN 10. 
[Sysname] vlan 10 
[Sysname-Vlan10] port Ethernet 1/0/1 
2)  Configure Switch B 
# Enable MSTP. 
<Sysname> system-view  
[Sysname] stp enable 
# Add Ethernet 1/0/1 to VLAN 10. 
[Sysname] vlan 10 
[Sysname-Vlan10] port Ethernet 1/0/1 
3)  Configure Switch C 
# Enable MSTP. 
<Sysname> system-view  
[Sysname] stp enable 
# Enable the VLAN-VPN tunnel function.