3com S7906E Instruccion De Instalación

Descargar
Página de 2621
1-55 
Switch B and Switch C connect to stub network N2 through their respective VLAN-interface 200, 
and to Switch E through VLAN-interface 103 and VLAN-interface 104 respectively. 
Switch E connects to Switch A, Switch B, Switch C and Switch D. 
The SSM group range is 232.1.1.0/24. 
IGMPv3 is to run between Switch A and N1, and between Switch B/Switch C and N2. 
Network diagram 
Figure 1-13 Network diagram for PIM-SSM configuration  
Ether
net
Ether
net
E
thernet
N1
N2
Vl
an-
in
t101
Vlan-
int10
1
 
Device 
Interface 
IP address 
Device 
Interface 
IP address 
Switch A 
Vlan-int100 
10.110.1.1/24 
Switch D 
Vlan-int300 
10.110.5.1/24 
 Vlan-int101 
192.168.1.1/24 
  Vlan-int101 
192.168.1.2/24 
 Vlan-int102 
192.168.9.1/24 
  Vlan-int105 
192.168.4.2/24 
Switch B 
Vlan-int200 
10.110.2.1/24 
Switch E 
Vlan-int104 
192.168.3.2/24 
 Vlan-int103 
192.168.2.1/24 
  Vlan-int103 
192.168.2.2/24 
Switch C 
Vlan-int200 
10.110.2.2/24  
Vlan-int102 
192.168.9.2/24 
 Vlan-int104 
192.168.3.1/24 
  Vlan-int105 
192.168.4.1/24 
 
Configuration procedure 
1) Configure 
IP 
addresses and unicast routing 
Configure the IP address and subnet mask for each interface as per 
. Detailed configuration 
steps are omitted here. 
Configure the OSPF protocol for interoperation among the switches in the PIM-SM domain. Ensure the 
network-layer interoperation in the PIM-SM domain and enable dynamic update of routing information 
among the switches through a unicast routing protocol. Detailed configuration steps are omitted here. 
2)  Enable IP multicast routing, and enable PIM-SM and IGMP 
# Enable IP multicast routing on Switch A, enable PIM-SM on each interface, and run IGMPv3 on 
VLAN-interface 100, which connects Switch A to the stub network.