3com S7906E Instruccion De Instalación

Descargar
Página de 2621
 
1-2 
 
Configuring Monitor Link 
Configuration Prerequisites 
Before assigning a port to a monitor link group, make sure the port is not the member port of any 
aggregation group or service loopback group.  
Configuration Procedure 
Follow these steps to configure monitor link: 
To do… 
Use the command… 
Remarks 
Enter system view 
system-view 
— 
Create a monitor link group and enter 
monitor link group view 
monitor-link group group-id 
Required 
In monitor link 
group view 
port interface-type 
interface-number
 uplink 
Configure the 
uplink for the 
monitor link group 
In Ethernet port 
view or Layer 2 
aggregate 
interface view 
port monitor-link group 
group-id uplink 
Use either approach 
Repeat this step to 
add more uplink ports
In monitor link 
group view 
port interface-type 
interface-number
 downlink 
Configure the 
downlink for the 
monitor link group 
In Ethernet port 
view or Layer 2 
aggregate 
interface view 
port monitor-link group 
group-id downlink 
Use either approach 
Repeat this step to 
add more downlink 
ports 
 
 
A port can be assigned to only one monitor link group.  
You are recommended to configure uplink ports prior to downlink ports, thus avoiding undesired 
down/up state changes on the downlink ports.  
 
Monitor Link Configuration Example 
Network requirements 
GigabitEthernet 2/0/1 and GigabitEthernet 2/0/2 of a device are up. Configure GigabitEthernet 2/0/2 to 
change its up/down state as GigabitEthernet 2/0/1.  
Configuration procedure 
<Sysname> system-view 
[Sysname] monitor-link group 1 
[Sysname-mtlk-group1] port gigabitethernet 2/0/1 uplink