Bunn CWTF TWIN Guía Del Usuario

Descargar
Página de 35
Page 4
ELECTRICAL HOOK-UP
CAUTION – 
Improper electrical installation will damage electronic components.
1.  An electrician must provide electrical service as specifi ed.
2.  Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
3.  Place the heater switchs at the rear of the brewer in the "OFF" lower position.
4.  Remove the front panel beneath the sprayheads.
5.  Feed the cord through the strain relief(s) and connect it to the terminal block(s).
6.  Connect the brewer to the power source and verify the voltage at the terminal block before proceeding.  Re-
place the front panel.
7.  If plumbing is to be hooked up later be sure the brewer is disconnected from the power source.  If plumbing 
has been hooked up, the brewer is ready for Initial Set-Up.
10737 081706
P1843
120/208 & 120/240V ac 
single phase models
Note: This electrical service 
consists of 3 current carrying 
conductors (Neutral, L1 and 
L2) and a separate conductor 
for earth ground.
Some 4/2 & 0/6 models 
require two individual branch 
circuits.
GREEN
GREEN
BLK
RED
120V. A.C.
120V. A.C.
208 or 240V. A.C.
WHI
L1
L2
N
200 or 230V ac 
single phase models
Note: This electrical service 
consists of 2 current carry-
ing conductors (L1 and L2) 
and a separate conductor 
for earth ground.
ELECTRICAL REQUIREMENTS
WARNING - The brewer must be disconnected from the power source until specifi ed in Initial Set-Up.
Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements.
GREEN
GREEN
200 or 230V. A.C.
BLK
RED
L1
L2
GREEN
GREEN
230V ac 
3 phase models
Note: This electrical service 
consists of 3 current carry-
ing conductors (L1, L2 and 
L3) and a separate conduc-
tor for earth ground.
BLU
RED
BLK
230V. A.C.
230V. A.C.
230V. A.C.
L1
L2
L3
P1843
P1842