Bunn dual sh brewwise dbc Guía De Operación

Descargar
Página de 54
Page 6
PLUMBING REQUIREMENTS
This brewer must be connected to a cold water system with operating pressure between 20 and 90 psi (138 
and 620 kPa) from a 
1
2
" or larger supply line. A shut-off valve should be installed in the line before the brewer. 
Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345 kPa). The 
water inlet fitting is 
1
4
" flare or female quick connect.
NOTE – Bunn-O-Matic recommends 
1
4
" copper tubing for installations of less than 25 feet and 
3
8
" for more than 25 
feet from the 
1
2
" water supply line. A tight coil of copper tubing in the water line will facilitate moving the brewer 
to clean the counter top. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The 
size and shape of the hole made in the supply line by this type of device may restrict water flow.
This equipment must be installed to comply with the Basic Plumbing Code of the Building Officials 
and Code Administrators International, Inc. (BOCA) and the Food Service Sanitation Manual of the 
Food and Drug Administration (FDA).  For models installed outside the U.S.A., you must comply 
with the applicable Plumbing/Sanitation Code for your area.
PLUMBING HOOK-UP
1.  Flush the water line and securely attach it to the flare fitting located on bottom of brewer.
2.  Turn on the water supply.
29877-3 051007