Bunn ICB Guía Del Usuario

Descargar
Página de 70
Page 6
WHITE/VIOLET
BLUE
WHITE
BACK
FRONT
120/208V
120/240V
120V
ELECTRICAL REQUIREMENTS
WARNING - The brewer must be disconnected from the power source until specifi ed in Initial Set-Up.
Requirements for brewers without an attached cord set are as follows:
Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements.
120V AC 
single phase models
ELECTRICAL HOOK-UP
CAUTION – Improper electrical installation will damage electronic components. 
1. 
An electrician must provide electrical service.
2. 
Determine the available on-site electrical service.
3. 
Select the desired unit voltage based on the available on-site electrical service.
4. 
Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
5. 
Remove the front access panel to gain access to the terminal block.
6. 
Feed the supply leads through the strain relief at the rear of the brewer.
7. 
Using the above diagrams, connect the desired electrical service to the fi eld wiring terminal block.
8. 
If wiring the machine for operation on 120/208 or 120/240 volts with a Power Supply Cord, the Power Supply 
Cord must be UL Listed Flexible Cord Type SO, SJO, SJTO, HSJO or SJOW, No. 12 AWG, 4 Conductor, Rated 
90° C.  Attachment Plug Cap must be UL Listed, NEMA 14-20P or L14-20P Confi guration, Rated 125/250V, 
20 AMPS.  If wiring the brewer for operation at 200V or 230V with a Power Supply Cord, the Power Supply 
Cord must  be of type “H07RN-F” with <HAR> marking, 1.5 mm
2
 conductor size, rated mimimom 90°C.  
Attachment male plug must be appropriate for Local/National use and must meet any Local/National Regula-
tory requirements/certifi cations if applicable.  The Power Supply Cord must be at least 3 feet (.91 m) long 
and maximum 6 feet (1.82 m) long (measured from Strain Relief to end of the Attachment Plug Cap).
 NOTE: If the power cord is damaged, it must be replaced by the manufacturer or its service agent or a 
similarly qualifi ed person in order to avoid a hazard.
9. 
Connect the brewer to the power source and verify the voltage at the terminal block.
10.  Set toggle switch on component bracket to the appropriate position and replace the access panel.
11.  If plumbing is to be hooked up later be sure the brewer is disconnected from the power source.  If plumbing 
has been hooked up, the brewer is ready for Initial Set-Up.
DUAL VOLT 
TOGGLE SWITCH
37077 101205
120/208 & 120/240V AC 
single phase models
GREEN
GREEN
BLK
RED
120V. A.C.
120V. A.C.
208 or 240V. A.C.
WHI
L1
L2
N
GREEN
GREEN
BLK
RED
WHI
L1
L2
N
120V. A.C.
Note: The two electrical services above require 3 current 
carring conductors (Neutral, L1 and L2) and a separate 
conductor for earth ground
200 or 230V AC 
single phase models
Note: This electrical service 
consists of 2 current carry-
ing conductors (L1 and L2) 
and a separate conductor 
for earth ground.
GREEN
GREEN
200 or 230V. A.C.
BLK
RED
L1
L2