Bunn U3 Manuales De Servicio

Descargar
Página de 41
Page 6
SELECTOR SWITCH (HALF BATCH OPTION)
FIG. 0 SELECTOR SWITCH (HALF BATCH)
Location:
 
The selector switch is located in the upper center 
of the switch mounting panel.
Test Procedures:
1.  Disconnect the brewer from the power source.
.  Disconnect the wires from the switch terminals.
3.  Check for continuity across the switch terminals 
with the switch in the "CLOSED" (left - half) posi-
tion. Continuity must not present when the switch 
is in the "OPEN" (right - full) position.
If  continuity  is  present  as  described,  the  switch  is 
operating properly.
If continuity is not present as described, replace the 
switch.
GRY to Brew Timer
PNK to Brew Timer
FIG. 1 SELECTOR SWITCH TERMINALS
P1740
P1317.30
SERVICE (cont.)
Removal and Replacement:
1.  Remove the wires from the switch terminals.
.  Compress the clips on the back side of the switch 
mounting bracket and gently push the through the 
opening.
3.  Push the new switch into the opening and spread 
the clips to hold switch in the mounting bracket.
4.  Refer to Fig. 1 and reconnect the wires. 
10060  080900