Cma -gl-c Manual De Propietario

Descargar
Página de 10
                                                                                                                                                      
Operation
 
4. Operation 
4.1. 
Filling of the Wash Tank 
•  With overflow drain tube in place in the detergent tank proceed to following. 
•  Turn power on-off/flush switch to the “ON” position. The water solenoid will activate and fill soap 
tank until the proper level is reached, also activating heating element. 
•  Set the thermostat for minimum 140°F/60°C. The wash tank temperature is regulated by heater 
and thermostat. 
4.2. Operation 
Instructions 
•  Open the door; place on-off/flush switch to the “ON” position. The wash tank will begin its 
automatic fill cycle.  
•  Verify product containers have chemicals.  
•  Detergent is fed from the supply container into the detergent tank in controlled amounts by the 
detergent pump. Use detergent at strength recommended by your chemical supplier. 
•  Place glasses on the conveyor wheel. Push conveyor rocker switch located on front right side of 
machine. The conveyor wheel will stop and start with conveyor shut-off rod. 
4.2.1.      Proper Chemical Dosage 
The amount of chemical delivered, whether it is detergent, sanitizer or rinse aid, is controlled using the set 
screw located on the circuit board attached to the control box.  
•  For detergent, contact your chemical supplier for proper type and detergent concentration. 
Note:  Detergent pump only operates when hot water tank is filling or when prime switches are 
activated.  
•  Circuit board basic settings are: arrow facing 9:00 for sani and rinse, 12:00 for detergent. 
 
Adjustments To Detergent Pump: 
•  When replacement container is installed, push the prime switch in and hold until the detergent feed line is full. 
•  Securely place overflow drain tube into soap tank and switch power on-off/flush switch to the “ON” position. 
The detergent dispenser will automatically dispense soap as the soap tank fills with water. 
•  The quantity of product can be regulated at the circuit board using the set screw.  
Adjustments To Sanitizer Pump: 
•  Follow same procedures as detergent for priming chemical. 
•  Push conveyor rocker switch located on the front of the machine. Place sanitizer test strip under the final rinse 
and read for proper level.  
•  The quantity of product can be controlled at the sani circuit board set screw.  
Note: Use chlorine test papers to verify and monitor the 50ppm chlorine level
MODEL GL-C SERVICE & PARTS MANUAL Rev. 1.02 –6/27/07                                                                                                             
Page