Canon model VB-S31D A&E Specifications 
OWNER / November 22, 2013 
28 23 00 - 3 
Video Surveillance System 
cameras.  Existing analog cameras shall use their existing coaxial cables which home run to the 
security control room on the second level.  The analog camera viewing the parking ramp in the 
basement shall continue to loop through the analog monitor in the Cashier's Office.  Where 
analog cameras are being replaced with IP cameras, the IP cameras shall use the existing coaxial 
cables via IP over Coax media converters at both ends of the coaxial cables.  Up to four IP 
cameras may share a single coaxial cable.  IP cameras remote from the converters shall use 
CAT-5e or better for interconnection.  Signals from analog cameras shall be converted to digital 
via encoders..The encoders shall also include an RS-485 connector for controlling PTZ cameras.  
IP signals from all cameras shall be connected to a patch panels in the security control room, 
then connected to network switches, then connected to the video servers in the MDF room via 
optical cables.  The network shall support three hard workstations--two in the  security control 
center and one at the security desk in the main lobby near the Fourth Avenue entrance. 
1.05  CONTRACTOR DESIGN REQUIREMENTS 
A. 
The Project Drawings represent the level of system design to be provided by OWNER.  
Contractor shall provide all additional system design work required, including: 
1. 
Conduit layout and sizing. 
2. 
Wire and cable layout and sizing. 
3. 
Point-to-point wiring and equipment hook-up information. 
4. 
Equipment mounting details. 
5. 
Design of equipment cabinets. 
6. 
Other detailed design work required. 
B. 
Contractor’s design shall conform to all applicable codes and ordinances.  All electrical design, 
including the sizing and placement of conduit, raceways and conductors, shall be in accordance 
with the current version of NFPA 70: National Electrical Code, unless local codes establish 
more stringent requirements. 
C. 
Contractor’s design work is subject to review and approval by OWNER’s Project Manager. 
D. 
Miscellaneous 
1. 
The addition of all wire, cable, conduit, connectors and junction boxes required for system 
operation. 
2. 
Complete “as-built” documentation of all security systems, including documentation of 
existing equipment, wiring, conduits, and raceways. 
1.06  SUBMITTALS 
A. 
Product Data 
Product Data submittal shall only be required if the Contractor requests a substitution or a 
particular brand product is not specified or recommended. 
B. 
Procedures 
1. 
Provide submittals to OWNER’s Project Manager. 
2. 
Submit two (2) copies of each submittal. 
C. 
Shop Drawings 
1. 
General Shop Drawings for the project as described elsewhere. 
2. 
Provide other Shop Drawings only if specifically requested by OWNER’s Project 
Manager.