Netgear M4100-D12G (GSM5212v1h1) - 10‐port GE + 2 GE Combo L2 Managed PD Switch Manual De Hardware

Descargar
Página de 33
Hardware Installation 
14
NETGEAR Managed Switch 
You can also take the following steps to prevent damage from electrostatic discharge (ESD):
1. 
When unpacking a static-sensitive component from its shipping carton, leave it in the 
antistatic package until you are ready to install it. Just before unwrapping the antistatic 
package, discharge static electricity from your body.
2. 
Before moving a sensitive component, place it in an antistatic container or package.
3. 
Handle all sensitive components in a static-safe area. If possible, use antistatic floor pads, 
workbench pads, and an antistatic grounding strap.
Unpack the Hardware
Check the contents of the boxes to make sure that all items are present before installing the 
switch.
1. 
Place the container on a clean flat surface and cut all straps securing the container.
2. 
Unpack the hardware from the boxes. 
Carefully remove the hardware and place it on a secure and clean surface. For more 
information, see 
15.
3. 
Remove all packing material.
4. 
Note:
If any item is missing or damaged, contact your local NETGEAR 
reseller for replacement.
5. 
Inspect the products and accessories for damage. 
Report any damage immediately.
Installation 
Install the equipment in the sequence presented in this section:
1. 
Select a location. 
2. 
Install the switch. 
16.
3. 
Check the installation. 
4. 
Apply power and check the LEDs.