Cisco Cisco ONS 15310-MA SONET Multiservice Platform Hoja De Datos

Descargar
Página de 5
 
 
© 2011 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public Information. 
Page 2 of 5 
Cisco ONS 15310-MA Wall Mount Enclosure Solutions 
The Cisco ONS 15310-MA can be integrated in a number of indoor and outside plant (OSP) enclosures, i.e. Wall 
Mount (indoors), Pad Mount and Pole Mount OSP (Pole Mount) cabinets that incorporate customer-approved 
third-party support components. The Indoor Wall Mount Enclosures aer available with three (3) power source 
options: 1) AC-WME (with Optional Battery Back-Up) for locations that have a 120VAC source, 2) –48VDC WME 
for locations that have a –48 VDC source, and 3) +24VDC WME for locations that have a +24 VDC source. These 
configurations are built and/or customized by a Cisco approved partner, Linkmont Technologies, Inc. (Linkmont). 
Ordering information is listed below. 
Figure 2.    Cisco ONS 15310-MA Wall Mount Enclosure with Optional Battery Backup  
 
The Cisco ONS 15310-MA AC-WME, a secure, wall-mountable enclosure, addresses those key FTTB 
requirements cost-effectively so that service providers can take full advantage of this opportunity at a fraction of 
the cost, in a fraction of the time. The Cisco ONS 15310-MA WME offers a rectifier with redundant modules, 8 
hours of battery back-up capability, and a Cisco ONS 15310-MA Metro Edge Optical Transport Platform as a 
single, integrated solution. 
The AC-WME is certified to operate indoors, not outdoors in uncontrolled environments, such as a covered facility 
that may be exposed to outside air and contaminants. The Cisco ONS 15310-MA is designed to house VRLA 
batteries used for battery back-up powering. The AC-WME provides multiple alarm inputs, which can be used to 
collect information at a remote location and transmit it back to a management center. The AC-WME comes with all 
of its components pre-installed and prewired (15310-MA DS1 and DS3 cables are not included and must be 
ordered separately) so that it can be installed, provisioned, and put into service in less than four (4) hours.