Cisco Cisco ONS 15454 SDH Multiservice Provisioning Platform (MSPP) Guía De Instalación
5
Installing ONS 15454 SDH E1-N-14 Cards
78-14605-01
Installation Procedures
–
Loopback Modes: Terminal and Facility
•
Environmental
–
Overvoltage Protection: as in ITU-T G.703 Annex B
–
Operating Temperature: -5 to +45 degrees Celsius
–
Operating Humidity: 5 - 95%, non-condensing
–
Power Consumption: 12.60 W, 0.26 A (AMPS) @ -48V, 43.0 BTU/Hr.
•
Dimensions
–
Height: 321.3 mm, (12.650 in.)
–
Width: 18.2 mm, (0.716 in.)
–
Depth: 228.6 mm, (9.000 in.)
–
Depth with backplane connector: 235 mm, (9.250 in.)
–
Weight not including clam shell: 0.8 kg (1.9 lbs.)
•
Compliance
ONS15454 SDH cards, when installed in a system, comply with these standards:
ONS15454 SDH cards, when installed in a system, comply with these standards:
–
Safety: IEC 60950, EN 60950, UL 60950, CSA C22.2 No. 60950, TS 001, AS/NZS 3260
Installation Procedures
Use this section if you are installing or removing the E1-N-14 card for the first time. After you become
familiar with ONS 15454 SDH card installation and boot up, use this section as a reference.
familiar with ONS 15454 SDH card installation and boot up, use this section as a reference.
Caution
Always use the supplied electrostatic discharge (ESD) wristband when working with an ONS 15454
SDH. Plug the wristband cable into the ESD jack located on the lower right outside edge of the shelf
assembly and ensure the shelf assembly is properly grounded.
SDH. Plug the wristband cable into the ESD jack located on the lower right outside edge of the shelf
assembly and ensure the shelf assembly is properly grounded.
Caution
Hazardous voltage or energy may be present on the backplane when the system is operating. Use caution
when servicing.
when servicing.
Step 1
Open the card ejectors.
Step 2
Carefully insert the card into the guide rails of the desired slot (
).
Step 3
Push the card into the connector on the back plane by closing the ejectors.