Cisco Cisco C880 M4 Server

Descargar
Página de 83
CHAPTER 2 Component Configuration and Replacement (Add, Remove) 
2.2 Replacing components 
27 
 
C122-E175-01EN 
Component name 
AC power off 
(Device stop) 
AC power on 
System off (hot 
maintenance) 
AC power on 
System on (hot 
maintenance) 
 
CPU 
Replaceable 
Replaceable 
Not replaceable 
DIMM 
Replaceable 
Replaceable 
Not replaceable 
Mezzanine 
Replaceable 
Replaceable 
Not replaceable 
 
DIMM 
Replaceable 
Replaceable 
Not replaceable 
Battery  
Replaceable 
Replaceable 
Not replaceable 
IOU_1GbE/IOU _10GbE 
Replaceable 
Replaceable 
Not replaceable  
 
PCI Express card   
Replaceable 
Replaceable 
Not replaceable 
DU 
Replaceable 
Replaceable 
Not replaceable 
 
PCI Express card   
Replaceable 
Replaceable 
Not replaceable 
 
FBU 
Replaceable 
Replaceable 
Not replaceable 
HDD/SSD 
Replaceable 
Replaceable 
Replaceable (*2)  
MMB 
Replaceable 
Not Replaceable 
Not replaceable  
OPL 
Replaceable 
Not replaceable 
Not replaceable 
MP, PDB 
Replaceable 
Not replaceable 
Not replaceable 
*1: Possible only in redundancy configuration. 
*2: Possible only for redundancy configuration with RAID. 
2.2.2  Component replacement conditions 
This section describes the replacement conditions of each component. 
PSU 
The PSU unit can be replaced while the system continues operating. PSU replacement in a non-redundant 
configuration requires the system to be stopped.  
FAN 
The FAN unit can be replaced while the system continues operating.  
SB 
SB can be replaced when the system is powered off.  
Remarks 
Since the CPU/Mezzanine/DIMM which is mounted on the SB can be replaced after removing the SB from 
the device, the replacement can be done under the same conditions as the SB.  
Note 
Since there may be a time deviation after the Home SB is replaced, set the time in the operating system 
when the NTP is not used.  
IOU_1GbE/IOU_10GbE 
IOU_1GbE and IOU_10GbE can be replaced when the system is powered off. 
DU 
DU can be replaced when the system is powered off.  
MMB 
MMB can be replaced when AC power of the system is off. 
2.2.3  Replacement procedures in cold maintenance 
This section describes the procedures before and after replacement in cold maintenance. 
Procedure before replacement 
Stop the system. 
Procedure after replacement 
Start the system.