Cisco Cisco ONS 15600 Multiservice Switching Platform (MSSP) Guía De Información

Descargar
Página de 3
 
Cisco Systems, Inc.  
All contents are Copyright © 1992–2005 Cisco Systems, Inc. All rights reserved. Important Notices and Privacy Statement. 
Page 1 of 3 
 
 
END-OF-LIFE NOTICE, NO. 2404 
END-OF-SALE AND END-OF-LIFE ANNOUNCEMENT FOR THE 
CISCO 15600-FTA 
Cisco Systems
®
 announces the End-of-Life of the Cisco
®
 15600-FTA. The last day to order the Cisco 15600-FTA is August 1, 2004. Customers 
will continue to receive support from the Cisco Technical Assistance Center (TAC) until August 1, 2009. Table 1 describes the End-of-Life 
milestones, definitions, and dates for the Cisco 15600-FTA. The 15600-FTA2 will then be available and completely replace the 15600-FTA. 
Currently the 15600-FTA is being sold and supports ANSI and ETSI –48 VDC environments. The 15600-FTA2 will replace the 15600-FTA 
and allow support for –60VDC SDH/ETSI environments. As the 15600-FTA2 fully supports all aspects of the 15600-FTA there is no need to 
support two Fan Tray Assemblies (FTA). 
The 15600-FTA2 will be introduced as part of the ONS 15600 R1.4.0 (Red River) System Release. R1.4.0 will be First Customer Ship on 
August 1, 2004. Manufacturing will monitor the 15600-FTA inventory, utilizing it until exhausted. 
As the 15600-FTA2 supports all SONET/ANSI and SDH/ETSI, including –60VDC applications, the 15600-FTA EoL will be transparent to 
customers. Current and interim customers for the 15600-FTA will be sold to SONET and ETSI environments with –48 VDC applications. 
Information about this product can be found at: 
http://www.cisco.com/univercd/cc/td/doc/product/ong/15600/index.htm
  
Table 1. 
End-of-Life Milestones and Dates for the Cisco 15600-FTA 
Milestone 
Definition 
Date 
End-of-Life Announcement 
Date 
The date the document that announces the End-of-Sale and End-of-Life of a product is 
distributed to the general public. 
January 28, 2004 
End-of-Sale Date 
The last date to order the product through Cisco point-of-sale mechanisms. The 
product is no longer for sale after this date. 
August 1, 2004 
Last Shipment Date 
The last-possible ship date that can be requested of Cisco and/or its contract 
manufacturers. Actual ship date is dependent on lead-time. 
November 1, 2004 
End of Software Maintenance 
Releases Date 
The last date that Cisco Engineering may release any final software maintenance 
releases or bug fixes. After this date, Cisco Engineering will no longer develop, repair, 
maintain, or test the product software. 
August 1, 2005 
End of Routine Failure 
Analysis Date 
The last possible date a routine failure analysis may be performed to determine the 
cause of product failure or defect. 
August 1, 2005 
End of New Service 
Attachment Date 
For equipment and software that is not covered by a service-and-support contract, this 
is the last date to order a new service-and-support contract or add the equipment 
and/or software to an existing service-and-support contract. 
August 1, 2005 
End of Service Contract 
Renewal Date 
The last date to extend or renew a service contract for the product. The extension or 
renewal period cannot extend beyond the last date of support. 
May 1, 2009 
Last Date of Support 
The last date to receive service and support for the product. After this date, all support 
services for the product are unavailable, and the product becomes obsolete. 
August 1, 2009