Cisco Cisco ONS 15600 Multiservice Switching Platform (MSSP) Guía De Instalación
12
Installing the Cisco ONS 15600 OC48/STM16 LR/LH 16 Port 1550 Card
78-15182-01
Related Documentation
Clear a Path Protection Force Switch
Step 1
In the CTC node view, click View > Go to Network View if this view is not already displayed.
Step 2
In the network map, right-click the span that you Force switched. Choose Circuits from the shortcut
menu.
menu.
The Circuits window is displayed.
Step 3
Choose Clear from the pull-down menu at the bottom of the window.
The Force switch is cleared.
Note
Active circuits are displayed green in the Circuits window. Standby circuits are displayed purple
in the window.
in the window.
Note
If these circuits are configured for revertive switching, they will revert to original paths after the
revertive time expires. If they are not revertive, they will not move back unless you Force-switch
them back. If the switch state is clear, you can complete the
revertive time expires. If they are not revertive, they will not move back unless you Force-switch
them back. If the switch state is clear, you can complete the
again to force traffic back to the original path.
Step 4
Return to the
, or to your originating procedure.
Related Documentation
•
DOC-7814303= Cisco ONS 15600 Procedure Guide
•
DOC-7814706= Cisco ONS 15600 Reference Manual
•
DOC-7814707= Cisco ONS 15600 Troubleshooting Guide
Obtaining Documentation and Submitting a Service Request
For information on obtaining documentation, submitting a service request, and gathering additional
information, see the monthly What’s New in Cisco Product Documentation, which also lists all new and
revised Cisco technical documentation, at:
information, see the monthly What’s New in Cisco Product Documentation, which also lists all new and
revised Cisco technical documentation, at:
Purpose
This procedure clears a path protection circuit Force switch. It is used to
revert traffic to the original circuits after the card has been serviced.
revert traffic to the original circuits after the card has been serviced.
Tools/Equipment
None
Prerequisite Procedures
Required/As Needed
As needed
Onsite/Remote
Onsite or remote