Cisco Cisco Web Security Appliance S690 Guía Del Usuario

Descargar
Página de 95
64
S A W M I L L   F O R   I R O N P O R T   7 . 3 . 3   U S E R   G U I D E
Maximum main table segment size to 
merge
IronPort recommends setting this value to 10% of the 
“Maximum main table segment size” value.
Build all indices simultaneously
Indicates that Sawmill for IronPort should build all indices 
at the same time instead of sequentially. 
Enabling this option can increase database creation 
performance, but also requires more RAM.
Build indices during log processing
Indicates that Sawmill for IronPort should build all indices 
when it processes the access logs to build the main 
database table.
Enabling this option can increase database creation 
performance, but also requires more RAM.
Build all cross-reference tables 
simultaneously
Indicates that Sawmill for IronPort should build all cross 
reference tables at the same time instead of sequentially. 
Enabling this option can increase database creation 
performance, but also requires more RAM.
Build cross-reference tables and indices 
simultaneously
Indicates that Sawmill for IronPort should build all cross 
reference tables at the same time as building all indices 
instead of sequentially. 
Enabling this option can increase database creation 
performance, but also requires more RAM.
Build cross-reference tables during log 
processing
Indicates that Sawmill for IronPort should build all cross 
reference tables when it processes the access logs to build 
the main database table. 
Enabling this option can increase database creation 
performance, but also requires more RAM.
Build cross-reference tables in threads
Indicates where Sawmill for IronPort builds the cross 
reference tables when it is configured to use multiple log 
processing threads (one for each processor). 
When Sawmill for IronPort is configured to use multiple 
log processing threads:
• Option is enabled. Each process builds cross reference 
tables for the table segments in that process.
• Option is disabled. The main process builds the cross 
reference tables for the main database table after the 
table segments for each process have been merged into 
the main table.
Table 5-1 Database Tuning Page Options (Continued)
Option
Description
WSA_Sawmill.book  Page 64  Tuesday, February 22, 2011  2:54 PM