Cisco Cisco UCS B420 M3 Blade Server Guía De Información
Ease of provisioning also positions Avago to respond rapidly to new business
opportunities. The company no longer needs to wait days or weeks to procure,
configure, and cable new servers.
opportunities. The company no longer needs to wait days or weeks to procure,
configure, and cable new servers.
“Before, we adapted our business processes to the constraints of the computing
system,” says Bob Rudy, chief information officer of Avago. “Now the Cisco Unified
Computing System is lifting that barrier.”
system,” says Bob Rudy, chief information officer of Avago. “Now the Cisco Unified
Computing System is lifting that barrier.”
Next Steps
Avago plans to move the applications that remain on the previous server platform to
the Cisco Unified Computing System, increasing return on investment. “Although the
Cisco Unified Computing System minimizes costs, its primary value is helping the
business operate better, faster, or more efficiently,” says Rudy. “Reducing cycle times
for shipping, reporting, and order management increases customer satisfaction and
accelerates revenue realization.”
the Cisco Unified Computing System, increasing return on investment. “Although the
Cisco Unified Computing System minimizes costs, its primary value is helping the
business operate better, faster, or more efficiently,” says Rudy. “Reducing cycle times
for shipping, reporting, and order management increases customer satisfaction and
accelerates revenue realization.”
Technical Implementation
All Cisco UCS Blade Servers in the system connect to the data network and SAN
through a pair of Cisco UCS 6100 Series Fabric Interconnects. Each fabric interconnect
connects to redundant Cisco Nexus 7000 Switches over one pair of cables, and to
EMC storage over three pairs of cables. Nexus IS, a Cisco Certified Gold Partner,
implemented the Cisco Nexus 7000 Switches.
All Cisco UCS Blade Servers in the system connect to the data network and SAN
through a pair of Cisco UCS 6100 Series Fabric Interconnects. Each fabric interconnect
connects to redundant Cisco Nexus 7000 Switches over one pair of cables, and to
EMC storage over three pairs of cables. Nexus IS, a Cisco Certified Gold Partner,
implemented the Cisco Nexus 7000 Switches.
Avago has so far consolidated 70 servers to 28 Cisco UCS B200 Blade Servers
powered by Intel Xeon 5500 series processors distributed across four chassis. The
Oracle production environment includes Oracle Linux 5.4 and 5.3, Oracle RAC 11g,
and Oracle E-Business Suite. The four servers used for Oracle RAC 11g and the 20
used for Oracle applications have 48 GB of memory. Another four servers comprise a
VMware virtual high-availability cluster, used for Avago’s boundary and infrastructure
services. These servers have 96 GB of memory and host 20 virtual servers on Linux
and Windows. Each chassis contains a mix of virtualized and native blade servers.
powered by Intel Xeon 5500 series processors distributed across four chassis. The
Oracle production environment includes Oracle Linux 5.4 and 5.3, Oracle RAC 11g,
and Oracle E-Business Suite. The four servers used for Oracle RAC 11g and the 20
used for Oracle applications have 48 GB of memory. Another four servers comprise a
VMware virtual high-availability cluster, used for Avago’s boundary and infrastructure
services. These servers have 96 GB of memory and host 20 virtual servers on Linux
and Windows. Each chassis contains a mix of virtualized and native blade servers.
For More Information
To find out more about Cisco and Oracle Data center Solutions, visit:
.
To find out more about Cisco Unified Computing System, visit:
.
To find out more about Cisco Data Center Business Advantage solutions, visit:
To find out more about Cisco Services, visit:
.
To find out more about Avago Technologies, visit:
To find out more about Intel, visit:
Data Center
• Cisco Unified Computing System
– Cisco UCS B200 Blade Servers
– Cisco UCS 6104 Fabric
• Cisco Unified Computing System
– Cisco UCS B200 Blade Servers
– Cisco UCS 6104 Fabric
Interconnects 6140 for
Production and Test/Dev, 6120
for DRCisco WebEx
Production and Test/Dev, 6120
for DRCisco WebEx
• Cisco Nexus 7000 Switches
• Intel Xeon 5500 Series processors
• Intel Xeon 5500 Series processors
• Cisco Proof of Concept Service
• Cisco UCS Migration and
• Cisco UCS Migration and
Transition Service
Product List
Services
Intel, the Intel Logo, Intel Core, and Core Inside are trademarks of Intel Corporation in the U.S. and other countries.
C36-659448-00 0411
Americas Headquarters
Cisco Systems, Inc.
San Jose, CA
Asia Pacific Headquarters
Cisco Systems (USA) Pte. Ltd.
Singapore
Europe Headquarters
Cisco Systems International BV Amsterdam,
The Netherlands
Cisco has more than 200 offices worldwide. Addresses, phone numbers, and fax numbers are listed on the Cisco Website at www.cisco.com/go/offices.
©2011 Cisco and/or its affiliates. All rights reserved. Cisco and the Cisco Logo are trademarks of Cisco Systems, Inc. and/or its affiliates in the U.S. and other
countries. A listing of Cisco's trademarks can be found at www.cisco.com/go/trademarks. Third party trademarks mentioned are the property of their respective
owners. The use of the word partner does not imply a partnership relationship between Cisco and any other company. (1005R)