Cisco Cisco IOS Software Release 12.4(2)XB Notas de publicación
![Cisco](https://files.manualsbrain.com/attachments/7380d0050044647c30f5c24bbbf5d0c0b6d9bb84/common/fit/150/50/faa183d287233c52228cfea3dbc2a127fe780f60564fcb0955d9c3d1cd23/brand_logo.png)
5
Release Notes for Cisco GGSN Release 6.0 on the Cisco MWAM, Cisco IOS Software Release 12.4(2)XB6
MIBs
Upgrading to a New Software Release
For information on upgrading to a new software release, see the product bulletin Cisco IOS Software
Upgrade Ordering Instructions located at:
Upgrade Ordering Instructions located at:
Upgrading IOS Image on MWAM
For information on upgrading IOS images on the MWAM, refer to the
:
http://www.cisco.com/univercd/cc/td/doc/product/core/cis7600/cfgnotes/mwam_icn.htm
Note
The image download process loads the IOS image onto the three processor complexes on the MWAM.
Upgrading ROMMON Software
To perform an ROMMON software upgrade, use the procedure provided in the
MIBs
Current MIBs
To obtain lists of supported MIBs by platform and Cisco IOS release, and to download MIB modules,
go to the Cisco MIB website on Cisco.com at
go to the Cisco MIB website on Cisco.com at
http://www.cisco.com/public/sw-center/netmgmt/cmtk/mibs.shtml
.
Limitations, Restrictions, and Important Notes
When using Cisco IOS Release 12.4(2)XB6, observe the following:
•
The number of PDP contexts supported on a GGSN is dependent on the memory and platform in use
and the GGSN configuration (for example, whether or not a method of Point to Point Protocol [PPP]
has been configured to forward packets beyond the terminal equipment and mobile termination,
whether Dynamic Feedback Protocol [DFP] is being used or the memory protection feature is
enabled, and what rate of PDP context creation will be supported).
and the GGSN configuration (for example, whether or not a method of Point to Point Protocol [PPP]
has been configured to forward packets beyond the terminal equipment and mobile termination,
whether Dynamic Feedback Protocol [DFP] is being used or the memory protection feature is
enabled, and what rate of PDP context creation will be supported).
Note
DFP weighs PPP PDPs against IP PDPs with one PPP PDP equal to eight IP PDPs.
For the Cisco 7200 series router, the following list shows the maximum number of PDP contexts
supported on the GGSN according to the memory and Cisco 7206 series router in use when no
method of PPP has been configured:
supported on the GGSN according to the memory and Cisco 7206 series router in use when no
method of PPP has been configured:
–
Cisco 7206 VXR NPE-300 with 256 Mb RAM—80,000 IP PDP contexts
–
Cisco 7206 VXR NPE-400 router with 512 Mb RAM—135,000 IP PDP contexts
For the Catalyst 6500 series switch/Cisco 7600 series router, the Cisco MWAM can support up to
60,000 IP PDP contexts per GGSN instance, with a maximum of 300,000 IP PDP contexts per
MWAM on which five GGSNs are configured.
60,000 IP PDP contexts per GGSN instance, with a maximum of 300,000 IP PDP contexts per
MWAM on which five GGSNs are configured.