Cisco Cisco Aironet 701e Access point Guía De Instalación

Descargar
Página de 22
6
 
Figure 2
AP-701E Kensington Lock Slot Location
5  
Preparing the Access Point
Before you mount and deploy your access point, we recommend that you perform a site survey (or use 
the site planning tool) to determine the best location to install your access point.
You should have the following information about your wireless network available:
Access point locations.
Access point mounting options: below a suspended ceiling or on a flat horizontal surface.
Access point power options: power supplied by the recommended external power supply (Cisco 
AIR-PWRINJ5=), PoE from a network device, or a PoE power injector/hub (usually located in a 
wiring closet).
Cisco recommends that you make a site map showing access point locations so that you can record the 
device MAC addresses from each location and return them to the person who is planning or managing 
your wireless network.
Installing the access point involves these operations:
Performing a pre-installation configuration (optional)
Mounting the access point
Configuring and Deploying the access point on the wireless network
1
Kensington Lock Slot