Cisco Cisco Packet Data Interworking Function (PDIF) Guía De Instalación
![Cisco](https://files.manualsbrain.com/attachments/7380d0050044647c30f5c24bbbf5d0c0b6d9bb84/common/fit/150/50/faa183d287233c52228cfea3dbc2a127fe780f60564fcb0955d9c3d1cd23/brand_logo.png)
Chassis Installation
▀ Grounding the Chassis
▄ ASR 5500 Installation Guide
58
Figure 10. Location of Chassis Ground Terminals
1
Chassis ground point
2
Grounding cable
3
2-hole lug
4
Flat washer
5
7/16-inch Kep nut
Grounding Procedure
Step 1
Remove the rear bottom cover from the chassis. Grasp both sides of the cover and pull out and up to unsnap the cover.
Step 2
Locate the ground terminal on the lower-left corner at the rear of the chassis.
Step 3
Use a 7/16-inch nut driver or socket wrench to remove the Kep nuts and washers from each post.
Step 4
Insert the lug connected to the grounding cable over the two posts.
Step 5
Secure the lug to the ground terminals with the Kep nuts and washers you removed in step 2. The nuts should be
torqued to 50 in-lb (5.65 N-m).
torqued to 50 in-lb (5.65 N-m).